Project Scope and Management
- Proposed Site Assessment
- Proposed Site Layout
- Program Definition Advisement
- Existing Facility Assessment
- Existing Facility DOH Code Assessment
- Engineer’s Construction Cost Estimates
- Budget Tracking
- Coordination of Design Professionals
Pool Design
- Swimming Pool
- Competitive Pool
- Diving Pool
- Wading Pool
- Spas
- Interactive Play Features
- Splash Pad
- Deck Equipment
- Filter Room Renovations
- Recirculation Systems
- Surge and Balance Tanks
- Chemical Treatment Systems
- Chemical Bulk Storage and Transfer Pads
Aquatic Facility Design
- Natatoriums
- Outdoor Facilities
- Facility Layout
- Equipment Buildings
- Bath House
- Shade Structures
- Playgrounds
Site Design
Construction Documents
- Prepare construction drawings in sufficient detail to permit bidding and constructing the project.
- Project Specifications
- Project Manual
- Construction Cost Estimate
Permitting
- County Department of Health Permit to Construct or Modify a Swimming Pool
- County Sanitary Disposal as required
- State and County Chemical Bulk Storage Permits as required
Construction Management
- Field Inspections of Construction
- Submittal Review
- RFI and Change Order Procedures
- Project Management
For Contractors
- Proposed Construction Design Changes
- Value Engineering
- Submittal Packages
- Operation Manuals
- As-Built Drawings